The job
A bathroom floor had an open toilet flange with tools and parts around it. The after photo shows a new white toilet in place against the tiled wall.
Typical steps for this job
The photos show the start and the finish; these are the usual steps in between:
- The flange was cleaned of the old seal.
- A new wax ring was set on the flange.
- The toilet was lowered and bolted down level.
- The water supply was connected and the toilet flushed to test it.
A toilet that rocks breaks its seal and leaks under the floor, so it is shimmed level before the bolts are tightened. The shut-off valve behind the toilet is checked too; a new toilet on an old, stuck valve is only half the job.
Posted on our Instagram @_gold_hands_ on 2 Apr 2024.
What a job like this costs
Plumbing is billed by the hour: $100 per hour with a 2-hour minimum, and the price is confirmed with you before work starts. With a list of tasks you can book time instead of one job: Hourly Handyman at $100 per hour (2-hour minimum), a Half Day of up to 4 hours for $399 or a Full Day of up to 8 hours for $749 (Half Day and Full Day). This page shows the work, not what this customer paid.
More about our plumbing service · areas we serve · all our work




